earthwork

Getting the Ground Ready for Seed, Planting the Yard, and Building a Deck

Hey there friends, just got a little poke in the rear from an e-mail saying UPDATE YOUR BLOG and then realized I’ve been a little lax about keeping up with my writings on Quadomated and Caleb the super dog. Seems I have a bit of a one track mind (been that way my whole
Read More

Aerial Photos and Final Earthwork

Thought I heard the buzzing of Paul Cyr and Gary Lavaway’s motorized parachute in between rain showers over the weekend, but wasn’t sure until now. Check out these super cool photos that showed up in my inbox this morning of Quadomated a few days after the pavement and just
Read More

Groundwork, Humongous Monoprice Order

So yeah, it has been a few days, but I’ve just been so busy getting everything ready for the electrical (i.e. the high-voltage and low voltage stuff) that I’ve been focusing in on that. You should see the Excel document with 7 worksheets, one in particular with more
Read More

Smoothing out the Dirt Piles, Roofing, Doors

What a bustle of activity up on the hill today! I was so busy this morning working on webpages and doing homework that I didn’t make it up to the job site until 2 PM. By that time the sun was shining full force through all the front windows and even without insulation I
Read More

Mud Pit!

It’s just an absolute mud pit up on the hill after all the rain. The roofers and builders have tried to push on through the crappy weather, but today just got too slippery and messy. This didn’t stop the groundwork people doing the foundation for the library. Earlier
Read More

Roof Finished, Earthwork, Rigid Insulation

Very busy day up on the hill! It finally warmed up this afternoon enough that I bundled myself up with a warm fleece, threw on a hat, and put my hood up like a gangster.  As I was rolling up State Street I could hear all sorts of commotion, sounded like heavy equipment moving
Read More

Roof Sheeting Day 5

Brrrr! It was only 28 degree when I woke up this morning! Too bad, because the cold weather is starting to keep me from going up the hill as often as I’d like. Not to worry, because the builders are really picking up the pace trying to get everything closed in before it
Read More

Finished Radiant Heat Tubing and Covered Septic Tank

Well folks, was hoping to have some pictures/video of the concrete being poured today, but the concrete contractor wanted to wait until the warmer and sunnier day of Saturday.  Let’s hope that the forecast stays at high 60s with sun. Wanted to mention something special we
Read More

Washed 3/4″ Stone Ready for Forms

Another busy day on the job site. Earthworks trucked in several loads of 3/4″ washed stone to serve as the under structure for the concrete slab. The stone was leveled to a depth of 12″ under the main portion of the house and 10″ under the garage (to allow for a
Read More

Gravel Pad Completed

Earthworks put in a strong day at the site and got a whole lot accomplished today. We’re extremely happy with the progress so far! I showed up at the site this morning to watch Mike and John work the bulldozer and vibrating roller as several loads of gravel were trucked in
Read More