Ready for the Concrete Guys!
Not too much to report on today. Spent yesterday morning up on site with the Earthworks crew digging an entrance/laying a 4 inch sleeve for the main water feed into the utility room. We ran into ledge at about 5 feet so 2 inches of foam was placed over the top of the water line. Read More